Categories
CIS 517 Week 3 Assignment 2 Waterfall And Agile (2 Papers)
$12.00

CIS 517 Week 3 Assignment 2 Waterfall And Agile (2 Papers)

This Tutorial was purchased 2 times & rated No rating by student like you.

 

This Tutorial contains following Attachments

  • CIS 517 Week 3 Assignment 2 Waterfall And Agile.zip

This Tutorial contains 2 Papers

 

Research agile methodologies including SCRUM and extreme programming (XP).

 

Write a three to four (3-4) page paper in which you:

1. Explain waterfall methodologies and identify their relationship to the PMBOK® process groups.

2. Explain agile methodologies and identify their relationship to the PMBOK® process groups.

3. Analyze the need for waterfall and agile methodologies.

4. Explain the advantages of extreme programming (XP) and analyze the advantages of its application in high-budget short-time projects.

5. Explain the factors to consider when selecting a project management methodology (Waterfall vs Agile).

6. Use at least three (3) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Your assignment must follow these formatting requirements:

· Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

· Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

Write a review

Order Id


Order Id will be kept Confidential
Your Name:


Your Review:
Rating:   A   B   C   D   F  

Enter the code in the box below:



Related Tutorials
$12.00

This Tutorial was purchased 4 times & rated A+ by student like you.

This Tutorial contains 2 Papers     Term Paper: Project Managers and Ethics, Leadership, and Technology Due Week 10 and worth 190 points   Project managers do a lot more than calculations and reporting; they must keep the team on track, ensure ethical decisi..
$12.00

This Tutorial was purchased 5 times & rated B+ by student like you.

This Tutorial contains 2 Papers     Utilizing the Delphi technique, your team constructed the following risks register the VoIP project containing the risk, the likelihood of its occurrence on a scale of 1 (least likely) to 5 (most likely), and the potential negative impact ..
$12.00

This Tutorial was purchased 0 times & rated No rating by student like you.

This Tutorial contains 2 Papers   Suppose the VoIP project sponsor wants you to present the project to the board of directors. Particularly, the sponsor would like you to discuss the quality of the project. It is worth noting that during the deployment of the VoIP system the quality ..
$12.00

This Tutorial was purchased 3 times & rated No rating by student like you.

This Tutorial contains 2 Papers   Update the Microsoft Project file you created in Assignment 3: VoIP Part 2 (Work Breakdown Structure) with the following changes:   ·        Set property values to denote progress in at least fifteen (1..
$12.00

This Tutorial was purchased 4 times & rated B+ by student like you.

This Tutorial contains 2 Papers   This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.   Overview As the project manager for an IT..
$12.00

This Tutorial was purchased 3 times & rated B+ by student like you.

This Tutorial contains 2 Papers   Research job boards for project manager positions. Take note of the various industries that hire project managers. Then, research statistics from the project management institute on the rate of success of projects in different industries including IT..
$50.00

This Tutorial was purchased 9 times & rated A by student like you.

This Tutorial contains 2 Set of Paper/PPT for each Assignment   CIS 517 Week 2 Assignment 1 The Role Of Project Managers (2 Papers) CIS 517 Week 3 Assignment 2 Waterfall And Agile (2 Papers) CIS 517 Week 5 Assignment 3 Voip Part 1 (Work Breakdown Structure) (2 Papers) CIS..